Enclosures Top Panel and integration checkout.

Selection of top panel mounting configuration can help the test engineers in charge of checkout and integration.
Look at the following images  and see how the slide out top panel will make the minimum pain in checkout and reinstalling.

Images are not to scale.

 

About LV_TS_Test_Engineer_3000_VI

Automated Test Equipment Software
This entry was posted in Test Sector. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s