The following are typical Top level meeting a Test Engineer will attend.
- Kick off Meeting – General Information about Project
- Preliminary Design Review – (Initial Design Presentation)
- Critical Design Review – (Last Review of Design)
- ATP – Acceptance Test Procedure (Validation of system)
- Customer Site Setup and Final ATP run( Sign off).
(along the way their will be status, project review,implementation review, and how-are-you doing, type meetings)